Sign In | Join Free | My enlightcorp.com
China FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD. logo
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD
Active Member

7 Years

Home > Climbing Formwork System >

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Contact Now

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System

Brand Name : Forpro

Model Number : Heavy duty climbing formwork system

Certification : ISO and CE

Place of Origin : shanghai

MOQ : 60 pcs

Payment Terms : L/C, T/T

Supply Ability : 10000 Pcs / year

Delivery Time : 30-45 work days

Packaging Details : Pallet

Product name : Jumping Formwork System

Material : Q235 Steel, bended profile,steel panel

Color : Blue lacquer, brown, light yellow

Size : 220KN per bracket

Application : dam , bridge abutment

Type : Wall Formwork, Steel formwork,Column formwork,Climbing formwork

Contact Now

Dam And Bridge Abutment Construction Jumping Formwork System

Description

The characteristics of high bridge piers are the height of the pier, the high center of gravity, the small cross-sectional area relative to the height of the pier, the flexibility of the pier, the high requirements for construction accuracy, the difficult axis control, and the high requirements for construction joint treatment.

The climbing formwork construction method not only saves construction materials, the construction speed is fast, but also the concrete surface is smooth and beautiful. It is currently the most advantageous construction method in the construction of high piers.


Elements
• Title back formwork unit could be timber beam large size formwork or steel formwork

• Triangle brackets bearing concrete pressure

• Panel travelling unit is option if reinforcement installation space is required

• Anchoring system 20.0 with high loadability

Features
•Main platform is 1.70 m wide for safe operation

• Formwork is title back or 600mm retraction space is also possible

• 3 levels of platform provide space for concrete pouring, formwork operation and concrete surface repairing

• Max. permitted pull force is 200kN per bracket for embedded tie rod

Climbing Formwork Installation Process

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System

Packing

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System

Applications Field

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System


Product Tags:

Bridge Abutment Construction Jump Formwork System

      

Dam Construction Jump Formwork System

      
Quality Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System for sale

Bridge Abutment Construction 1.7m Wide Platform Jump Formwork System Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)