Sign In | Join Free | My enlightcorp.com |
|
Brand Name : ForPro
Model Number : CF220
Certification : ISO and CE
Place of Origin : shanghai
MOQ : 20 pcs
Payment Terms : L/C, T/T
Supply Ability : 10000 pcs / year
Delivery Time : 30-45 work days
Packaging Details : Pallet
Material : Q235 Steel, timber beam,Plywood
Color : Yellow,Blue,Black
Size : customized
Application : Concrete Construction, Building Construction, wall and column concrete construction, Pier,Bridge,Super high-rise building etc
Product name : Hot sale sturdy long lasting , peri wall formwork system, H20 beam H20 wooden beam formwork H20 bimber team, High recycling value climbing formwork with factory price, Concrete Steel Formwork
Type : Wall Formwork, Steel formwork,Column formwork,Climbing formwork
Advantage : Easly Removable, Easy Operation Quick climbing and high saftly Coefficient
Feature : Light Weight, One-time Pouring, Fast Assembly & Positioning, Reuses
Safety Concrete 2.2m Main Platform Jump Formwork System
Outline
Climbing formwork construction takes pouring reinforced concrete as an important supporting body. The formwork is closely attached to the concrete. The upper formwork is supported by the adhesion and friction of the concrete on the lower formwork. The sag, flatness and curvature are easy to adjust and control. To avoid the accumulation of construction errors, the design is reasonable, the template does not occupy the construction site, and can be recycled without configuring too many quantities.
Component
• ForPro Formwork System: Timber Beam, Steel Waler, Waler Clamp, Lifting Bracket.
• Climbing Brackets: Horizontal Bracket, Diagonal Strut, Vertical Waling, Travelling unit, Waler Hook Bolt.
• Anchoring System: Climbing Cone, Position Cone, Position Disc, High Strength Screw, Embedded Anchor.
Technical Specification
• Main platform width up to 2.2m, provides sufficient space for workers
• Retraction formwork panel up to 60cm, enough panel cleanings space from concrete side
• 3 to 5 levels working platform provides place for concrete pouring, formwork operation and concrete surface repairing etc.
Features
• Formwork panel can be retracted back 60cm from the concrete wall
• Formwork panels and climbing brackets are preassembled one time and can be reused many times
• CF220 climbing formwork is safely anchored on concrete structure during whole working procedure
• One climbing unit will only lost 2 embedded anchors each casting step (one unit is composed of 2 climbing brackets).
• Plywood could possible to be reused 30 times under properly operation.
Product Sketches
The Formwork Operation Process
Applications
![]() |
Reusable 2.2m Width Platform Jump Formwork System Images |