Sign In | Join Free | My enlightcorp.com
China FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD. logo
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD
Active Member

7 Years

Home > Climbing Formwork System >

Crane Lifted Jump Form System For Core Wall Concrete

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Contact Now

Crane Lifted Jump Form System For Core Wall Concrete

Brand Name : CF240

Model Number : Crane lifted formwork

Certification : ISO and CE

Place of Origin : shanghai

MOQ : 20 Piece

Payment Terms : L/C, T/T

Supply Ability : 1000 Piece / year

Delivery Time : 30-45 work days

Packaging Details : Pallet

Material : Q235 Steel, timber beam,Plywood

Color : Hot-galvanize, yellow,brown

Size : Width 2400mm

Application : High rise buildings, pylons,piers

Product name : Jump Form System

Type : Wall Formwork, Steel formwork,Column formwork,Climbing formwork

Contact Now

Crane Lifted Jump Form System For Core Wall And Bridge Concrete

Features
Platform width: 2.40m

Formwork panel can be move back 70cm from the concrete wall

• Platform level can be adjusted to meet structure inclination up to 150

CF240 climbing formwork is safely anchored on concrete structure the whole working stage.
Only 1 anchor will be losted each casting step for one climbing bracket


Elements
• Large area formwork panel

• Climbing brackets CF240

• Panel travelling unit

• Anchoring system D20.0

The Concrete Pouring Process

Crane Lifted Jump Form System For Core Wall Concrete

Applications Field

Crane Lifted Jump Form System For Core Wall ConcreteCrane Lifted Jump Form System For Core Wall Concrete

The main working principle of climbing mode

The climbing form lifting process is achieved by the climbing jack alternately lifting the guide rail and the climbing frame. The climbing frame and the guide rail are not connected to each other, and they can move relative to each other. During the operation of the climbing frame, the climbing frame and the guide rail are always supported on the embedded part support, and they are relatively static. After demolding, immediately install the load-bearing bolts, hanger body, and embedded part support on the climbing cone left after demolding. The lifting guide rail is realized by adjusting the direction of the pawl of the upper and lower reversing box. When the guide rail is lifted in place, after the newly installed embedded part support is in place, immediately remove the embedded parts support, climbing cone and other parts exposed after the guide rail is lifted at the lower platform. Then release all the knots on the climbing frame, adjust the direction of the upper and lower pawls, start the oil cylinder, and the climbing frame can be lifted. At this time, the climbing frame is moving relative to the guide rail, and the guide rail is stationary. Through the alternate attachment of the guide rail and the climbing frame to the pier column, they can lift each other. Layer promotion.


Product Tags:

Crane Lifted Jump Form System

      

Hot Galvanize Jump Form System

      
Quality Crane Lifted Jump Form System For Core Wall Concrete for sale

Crane Lifted Jump Form System For Core Wall Concrete Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)