Sign In | Join Free | My enlightcorp.com
China FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD. logo
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD
Active Member

7 Years

Home > Climbing Formwork System >

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Contact Now

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork

  • 1
  • 2

Brand Name : Forpro

Model Number : Modular climbing formwork system

Certification : CE/ SGS,ISO

Place of Origin : shanghai

MOQ : 20 pcs

Payment Terms : L/C, T/T

Supply Ability : 1000 Pcs / year

Delivery Time : 30-45 work days

Packaging Details : Pallet

Material : Q235 Steel, timber beam,Plywood

Color : yellow

Size : 50KN per bracket

Application : High verticle structure, shiplock, pylon legs, high piers

Product name : Jump Form Formwork CF240 system

Type : Wall Formwork, Steel formwork,Column formwork,Climbing formwork

Name : Concorete Formwork,formwork system for High buidling/Bridges/dam/pier/tunnel/workshop

Contact Now

Hot Galvanizing Main Platform 2.4m Wide Jump Form Formwork

Description

Since the formwork can climb by itself and does not require lifting and transporting machinery, the lifting workload of the lifting and transporting machinery in the construction of high-rise buildings is reduced, and the large formwork can be prevented from stopping due to the influence of strong wind. Since scaffolds are hung on the self-climbing formwork, the external scaffolding in the construction stage of the structure is also omitted, because it can reduce the number of cranes and speed up the construction speed, which has better economic benefits.

Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork

• Climbing brackets incude horzontal profile and verticel profile

• Panel travelling unit can trave formwork 650mm away from concrete

• Anchoring system D20.0 with high loadability

Features
• Main Platform is 2.40 wide for safe operation

• Formwork 650mm retraction space for easy cleaning

• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150

• High capacity of 50KN per bracket and bracket is safely anchored on concrete structure with high strength anchor parts.

Safety
The embedded system uses special high-specification embedded parts.
The main general steel components are made of hot-dip zinc.
Platforms at all levels and external protection adopt rigid protection technology.


Efficient
One layer every 4-5 days, you can reach any height you want and the surface quality is high.


economic
The use of external power to upgrade and the use of a three-tier platform has greatly reduced costs.


Beautiful
For your project's own professional template scheme, standard products and standard colors, you can be impeccable in the visual impact of technical solutions and product use.


Diverse product choices
You can choose the appropriate plywood according to the number of turnovers.
Platform plates (wood products, steel springboards, shaped steel plates) can be selected according to construction requirements.
According to the construction requirements, you can choose the enclosure material (custom punched steel plate, dense mesh).

Climbing Formwork Installation Process

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork

Applications Field

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork

Factory

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork


Product Tags:

2.4m Wide Platform Jump Form Formwork

      

Hot Galvanizing Jump Form Formwork

      
Quality Hot Galvanizing 2.4m Wide Platform Jump Form Formwork for sale

Hot Galvanizing 2.4m Wide Platform Jump Form Formwork Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)