Sign In | Join Free | My enlightcorp.com
China FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD. logo
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD
Active Member

7 Years

Home > Wall Formwork System >

Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Contact Now

Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler

Brand Name : ForPro

Model Number : 4140x730, 6210x730

Certification : ISO and CE

Place of Origin : Shanghai

MOQ : 2000sqm

Price : FOB

Payment Terms : L/C, T/T

Supply Ability : 1000000000sqm/Year

Delivery Time : 20-25 Work days

Packaging Details : Pallet

Material : Q235 Steel,

Size : customized

feature : Galvanize,light-weight, platform,Safe and efficient

Contact Now

No matter geometry, size and height, Timber beam column formwork can form any columns. With standard timber beam H20 and steel waler, the column formwork could be quickly assembled with less labour costs. With customized big size plywood, It is easy to achieve first class concrete surface. After assembling, the whole column formwork could be lift as one unit to new position. One time assembly and several reuse cycling, Timber beam column formwrok provide not only better concrete surface but also speedy construction time.The system has the same parts with wall formwork.

Main Parts

  • Optional any plywood sheet according to specific requirements of the projects
  • Universal timer beam H20
  • Universal steel waler
  • Accessories

Technical Specification

  • Max. permissable pressure is 80kN/m2
  • Max.Cross section is 1.0mx1.0m without in-through tie rod
  • Flexible adjustment to fit different column dimension

Applications

Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler

Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler

Forpro Service

Provide support in every stage of projects

  • Provide cosult when client take part in projects bid invitation.
  • Provide optimized formwork tender solution to assitant client to win the project.
  • Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
  • Start to design the formwork detailedly according to the winning bidding.
  • Provide economic formwork solution package and provide continous on-site support service.


Product Tags:

frame type scaffolding

      

ringlock scaffolding system

      
Quality Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler for sale

Concrete System Column Formwork with Standard Timber Beam H20 and Steel Waler Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)