Sign In | Join Free | My enlightcorp.com |
|
Brand Name : Forpro
Model Number : Crane lifted formwork CF240
Certification : ISO and CE
Place of Origin : shanghai
MOQ : 20 Piece
Payment Terms : L/C, T/T
Supply Ability : 1000 Piece / year
Delivery Time : 30-45 work days
Packaging Details : Pallet
Material : Q235 Steel, timber beam,Plywood
Color : Silver, yellow,brown
Size : Width 2400mm
Application : Tower, core of highrise building, shiplift
Product name : Crane lift climbing formwork
Type : Wall Formwork, Steel formwork,Column formwork,Climbing formwork
Intelligent Modular Climbing Scaffolding with Formwork to Construct High-rise Building
Description
The Climbing Formwork CF240 is a crane lifted climbing formwork. With its high loadability, it is designed for precise and convienient operation for all high-rise projects, It is an ideal option for pylons,piers and towers projects etc. It provides multi level platform for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination.
Elements
• Large area formwork panel or steel frame formwork or steel formwork
• Modular climbing brackets CF240
• Panel travelling unit
• Anchoring system 20.0
Features
• Platform width: 2.40m
• Formwork move back 70cm from the concrete wall, leave enough space for formwork cleaning
• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150
• Climbing scaffolding is safely anchored on concrete structure with high strength anchor parts.
• Together with self climber to work as self climbing formwork system
Climbing Formwork Installation Process
Applications scope
Forpro Service
Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.
3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.
![]() |
Modular Climbing Scaffolding System , Crane Lifted Climbing Formwork Images |