Sign In | Join Free | My enlightcorp.com
China FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD. logo
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD
Active Member

7 Years

Home > Climbing Formwork System >

Pier Climbing Formwork System

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Contact Now

Pier Climbing Formwork System

  • 1
  • 2

Brand Name : Forpro

Model Number : Modular climbing formwork system

Certification : CE/ SGS,ISO

Place of Origin : shanghai

MOQ : 20 pcs

Payment Terms : L/C, T/T

Supply Ability : 1000 Pcs / year

Delivery Time : 30-45 work days

Packaging Details : Pallet

Size : 50KN per bracket

Application : High verticle structure, shiplock, pylon legs, high piers

Product name : Jump Form Formwork CF240 system

Type : Wall Formwork, Steel formwork,Column formwork,Climbing formwork

Name : Concorete Formwork,formwork system for High buidling/Bridges/dam/pier/tunnel/workshop

Contact Now

Jump Formwork System With Automatic Hydraulic System & 2.4m Wide Platform

Outline


Climbing formwork construction takes pouring reinforced concrete as an important supporting body. The formwork is closely attached to the concrete. The upper formwork is supported by the adhesion and friction of the concrete on the lower formwork. The sag, flatness and curvature are easy to adjust and control. To avoid the accumulation of construction errors, the design is reasonable, the template does not occupy the construction site, and can be recycled without configuring too many quantities.


Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork

• Climbing brackets incude horzontal profile and verticel profile

• Panel travelling unit can trave formwork 650mm away from concrete

• Anchoring system D20.0 with high loadability

Technical Specification

Main platform width up to 2.2m, provides sufficient space for workers
Retraction formwork panel up to 60cm, enough panel cleanings space from concrete side
3 to 5 levels working platform provides place for concrete pouring, formwork operation and concrete surface repairing etc.

Applications Field

Pier Climbing Formwork System

Pier Climbing Formwork System


Product Tags:

Automatic Hydraulic Jump Formwork System

      

Tunnel Jump Formwork System

      

Tunnel Jump Form Formwork

      
Quality Pier Climbing Formwork System for sale

Pier Climbing Formwork System Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)